50 kW / 110 kWh Battery Storage for a Solar EV Charging Station in Shenzhen
YOTAI PARTNER REFERENCE · YINTU ENERGY SOLUTIONS
YOTAI's collection includes a solar-and-storage charging-station reference at Longhua Central Park in Shenzhen. It lists a 50 kW / 110 kWh storage unit within a PV, battery, grid and rapid-charging scheme, with demand management and better use of local generation as its main objectives.
Project at a Glance
| Location | Longhua Central Park, Shenzhen, China |
|---|---|
| Application | Solar-storage rapid EV charging station |
| Project scale in source | 50 kW / 110 kWh storage |
| Equipment in source | One Smart 110 kWh PV-storage all-in-one unit |
| Control objectives | PV utilisation, import-overload prevention, export control and peak management |
Customer Situation and Energy Requirements
EV charging demand depends on vehicle arrivals and charging behaviour. Several coincident sessions can place a high request on a connection whose available capacity is lower than the total charger nameplate power. The reference identifies grid impact and voltage-drop concerns as project drivers.
The source also describes surplus PV, time-of-use energy management and an objective of avoiding transformer expansion. It mentions demand-side response as a possible operating function. The collection does not provide charger ratings, a connection-capacity study or evidence of market-service participation.
Storage Integration and Control Strategy
The intended daily energy strategy charges storage during suitable lower-value or lower-demand periods and supplies selected charging demand later. Local PV can contribute when available. A controller needs to coordinate charger demand and battery dispatch against the actual import limit.
The reference prioritises local solar and battery energy when those resources can serve the load. It also lists overload prevention and dynamic capacity support. In engineering terms, the battery can support part of the instantaneous demand within its available power and energy, while the approved connection and protection ratings remain in force.
A 50 kW storage rating should not be read as the charging station's total output. Multiple chargers may still operate with a combination of utility, PV and battery supply, subject to power sharing. Prolonged high demand can exhaust the available stored energy, so the control design needs an agreed fallback such as reducing charging power.
Intended Operational Value
The case illustrates the role of storage as a buffer between a variable charging load and a constrained electrical connection. Additional intended value comes from using solar within the station and shifting selected grid purchases between tariff periods.
The reference does not quantify charging throughput, demand-response income, voltage improvement or verified avoided-expansion cost. A new proposal should evaluate those outcomes using the connection agreement, vehicle-use profile and accepted electrical design.
Planning a Comparable Installation
- Collect charger demand and session-duration data rather than vehicle counts alone.
- Confirm the connection import limit and charger power-sharing capability.
- Model the time needed to restore SOC between busy periods.
- Specify the response when PV is low or battery power and energy are unavailable.
Related YINTU Storage Options
The 50 kW / 115.2 kWh commercial storage cabinet is a related current option for an AC-coupled charging-site assessment, with different energy from the case equipment. Our BESS sizing guide explains why converter power and usable energy should be evaluated separately.
How YINTU Supports a Comparable Project
YINTU is an energy storage solution provider working with manufacturing partners, including YOTAI. We support application assessment, equipment selection and technical coordination for customer-specific projects. This article presents a supplier reference. YINTU does not claim to have designed or installed the featured site.
For a new proposal, share charger ratings, session profiles, connection capacity, PV generation and the expected charging-service requirements. The agreed technical scope defines equipment, interfaces and service responsibilities. The source's 110 kWh equipment family should not be treated as identical to a current catalogue product with a different rating.
Project Questions
Does a battery remove the station’s grid-capacity limit?
It can support selected demand within its operating limits. The site still needs to observe the agreed connection limit and maintain an operating strategy for a depleted or unavailable battery.
Is demand-response revenue established by this reference?
The source lists participation as an objective. It supplies no enrolment, dispatch or settlement records, so revenue is not assumed.