8 Ft Containerized Battery Storage Systems 200-375 KW 480-520 KWh Air Cooled Hybrid ESS
8 Ft Containerized Battery Storage Systems
,Air Cooled Containerized LiFePO4 BESS
,520 kWh Air Cooled Hybrid ESS
CONTAINERIZED SOLAR STORAGE & CHARGING SOLUTIONS
200-375 kW / 480-520 kWh Air-Cooled Hybrid ESS
8-ft containerized LiFePO4 storage with 200-375 kW output and 480-520 kWh energy. Combines battery, BMS, PCS and EMS for solar-storage charging projects, on/off-grid operation and generator-supported microgrids. EV chargers are project-selected.
Product Overview
A compact equipment block for commercial solar charging sites, service stations and distributed facilities where space is limited. Three power-and-energy combinations allow the design to follow the site load rather than one fixed configuration.
YINTU is an energy storage solution provider. We work with capable manufacturing partners to select equipment, coordinate technical information and develop a configuration around the customer's site requirements. The listed product is a configurable platform; the supply and service boundaries are agreed for each project.
How Solar, Storage and Charging Work Together
Solar generation can serve site demand while storage shifts selected energy to later periods. The PCS connects the DC battery system with AC loads, and EMS coordination supports the chosen operating schedule and reserve policy. External EV charging equipment can be included in the site solution after its rating, quantity, charging interface and control compatibility are selected.
Every configuration in this series includes integrated MPPT for direct PV input. PV string design must meet the voltage and channel-current limits in the table.
The generator port provides an interface for an external diesel generator where required. Grid and generator operation, switchgear and source-transfer logic follow the approved electrical design. AC/DC integration here describes the storage and conversion architecture; the specification does not state built-in EV charging guns or a direct DC EV charging output.
Key Features
AC and DC equipment integrated around one control platform
LiFePO4 batteries, BMS, PCS and EMS are integrated with a generator port. The battery operates on the DC side and the PCS provides the AC interface. This creates a coordinated equipment platform for solar-storage charging projects while the site distribution, protection and external chargers are designed as part of the complete solution.
PV integration matched to the selected configuration
Every configuration in this series includes integrated MPPT for direct PV input. PV string design must meet the voltage and channel-current limits in the table.
On-grid and off-grid operation
The datasheet lists rated power for both modes and a switching time below 10 ms. The project design coordinates the grid connection, generator, essential loads and transfer arrangement. This rating should not be treated as a universal no-interruption guarantee for every load.
Thermal management and protection
The IP54 enclosure combines air conditioning for the battery with intelligent PCS cooling and an integrated fire protection system. The quoted operating temperature is -10 to +50 C, with humidity from 5% to 95% and altitude <3000 m.
Expandable project architecture
Up to four units can operate in parallel, as stated for this series. Parallel operation requires a coordinated control, communication, cable and protection design.
Applications and Project Value
Solar charging at commercial sites
Pair canopy or rooftop PV with battery storage and separate EV chargers. Solar can serve daytime demand, and scheduled battery discharge can support later charging sessions or site peak management. The charger count and simultaneous charging power are sized together with the building load.
Service stations and supermarkets
Coordinate lighting, refrigeration, payment systems and other essential loads with solar and storage. The compact enclosure can suit a dedicated equipment area where installation space is constrained; site layout, ventilation clearance and access still require project review.
Remote communities and island facilities
Use the generator port, PV input and stored energy to form a coordinated supply arrangement where grid access is limited. YINTU helps define essential-load priorities and the generator operating strategy with the manufacturing partner.
Distributed backup and small factories
Support selected process, office or emergency loads during a supply interruption. The stated switching time is below 10 ms; actual load continuity also depends on switching equipment, control settings and the electrical design.
Configuration Comparison
| Parameter | 200 kW / 480 kWh | 250 kW / 520 kWh | 375 kW / 520 kWh |
|---|---|---|---|
| Rated battery energy | 480 kWh | 520 kWh | 520 kWh |
| Maximum PV input | 240 kW | 240 kW | 480 kW |
| Maximum PV voltage | 950 V DC | 950 V DC | 950 V DC |
| MPPT voltage range | 250-850 V DC | 250-850 V DC | 250-850 V DC |
| PV input current (source notation) | 200 A x 2 | 200 A x 2 | 200 A x 4 |
| MPPT channels | 2 | 2 | 4 |
| Rated AC power: on-grid / off-grid | 200 kW | 250 kW | 375 kW |
| Maximum AC current: on-grid / off-grid | 300 A | 375 A | 560 A |
| Approximate system weight | 5,250 kg | 5,500 kg | 5,560 kg |
Every configuration in this series includes integrated MPPT for direct PV input. PV string design must meet the voltage and channel-current limits in the table.
Power and energy are paired configurations, not independent values that can be freely mixed. Battery energy, voltage and ampere-hour values are reproduced as specified; practical usable energy and backup time depend on the final operating limits and site load. PV current notation is preserved as 200 A multiplied by the stated channel count.
System and Installation Parameters
| Item | Specification |
|---|---|
| AC voltage / wiring | 400 / 230 V AC; L1 / L2 / L3 / N / PE |
| Frequency | 50 / 60 Hz |
| On/off-grid switching time | <10 ms |
| Maximum parallel units | Up to 4 units |
| Diesel generator port | Yes |
| Communication | RS485 / Wi-Fi |
| Ingress protection | IP54 |
| Fire protection system | Yes |
| Operating temperature | -10 to +50 C |
| Humidity | 5-95% |
| Operating altitude | <3000 m |
| Battery cooling | Air conditioning |
| PCS cooling | Intelligent cooling |
| Dimensions (source order) | 2500 x 2250 x 2400 mm |
Dimensions retain the order used in the supplied datasheet; axis labels are not inferred. Weights are approximate and vary with configuration. Confirm the final installation drawing, lifting plan, foundation loading, service clearances and cable routing before deployment.
YINTU Project Selection and Supply Scope
Start with the country and site environment, grid voltage, interval load profile, PV array or existing inverter information, generator details and backup priorities. For a charging project, add charger power, vehicle schedule and expected simultaneous demand. YINTU coordinates configuration selection and technical clarification with the manufacturing partner.
The proposal defines the selected storage configuration, controls, switchgear and any project accessories. PV modules, external PV inverters where needed, diesel generators, EV chargers, civil works, transport, installation and commissioning are included only when listed in the agreed scope. Certification documents, warranty, pricing, lead time and payment terms are confirmed for the selected model and destination.
Frequently Asked Questions
Are EV chargers built into the container?
The supplied datasheet describes a PV-storage-diesel microgrid platform and does not specify built-in charging guns or charger ratings. YINTU can coordinate a solar-storage charging solution using separately selected EV chargers and a suitable site distribution and control design.
Can PV strings connect directly?
Every configuration in this series includes integrated MPPT for direct PV input. PV string design must meet the voltage and channel-current limits in the table.
Can it operate when the grid is unavailable?
The series includes off-grid ratings and a stated switching time below 10 ms. The final design must establish the supported loads, reserve, source-transfer arrangement and generator coordination where used.
How many units can be connected in parallel?
Up to 4 units. The final quantity and control arrangement must be confirmed for the project.
What determines backup duration?
The selected energy configuration, usable SOC window, reserve policy, conversion and auxiliary losses, temperature and changing site demand all affect runtime. Nominal kWh alone is not a guaranteed AC energy delivery or backup duration.
Plan Your Solar-Storage Charging Project
Send YINTU your load profile, PV plan, charging requirements and backup target. We will coordinate a suitable configuration and a clear equipment proposal with the manufacturing partner.
Technical source: YT-Hybrid ESS-200-375kW-480-520kWh-Air datasheet, V1.0, October 2026. Final specifications and included equipment follow the approved project configuration.
Floor Standing Residential Energy Storage Systems 16 KWh Long Lasting Home Energy Solutions
Indoor Floor Standing Residential Energy Storage Systems All In One Solar Storage For Homes
12 KW / 32 KWh Stackable Home Solar Energy Storage Systems All In One ESS IP20