375-500 KW / 780-1000 KWh Air Cooled Hybrid ESS Containerized Energy Storage

Brand Name:YINTU
Model Number:YT-Hybrid ESS-375-500kW-780-1000kWh-Air
Price:Project-specific quotation
Product Details
Highlight:

10 ft Air Cooled Containerized BESS

,

Air Cooled Containerized LiFePO4 ESS

,

1000 kWh Containerized Battery Storage

Rated AC Power: 375-500 KW; Configuration-dependent
Rated Battery Energy: 780-1000 KWh; Configuration-dependent
Battery Chemistry: LiFePO4
Container Format: 10-ft
Battery Cooling: Air Conditioning
Protection Level: IP54
Integrated Equipment: Battery / BMS / PCS / EMS / Generator Port
PV Integration: 360-360 KW Integrated PV; External Inverter On 500 KW Version
MPPT Channels: 3; External-inverter Version Excluded
AC Voltage: 400 / 230 V AC; L1 / L2 / L3 / N / PE
Frequency: 50 / 60 Hz
On/Off-Grid Transfer: <10 Ms, As Specified
Parallel Operation: Multiple Units; Project-specific Quantity
Generator Port: Yes
Fire Protection: Integrated System
Communication: RS485 / Wi-Fi
Operating Temperature: -10 To +55 C
Dimensions (Source Order): 2991 X 2438 X 2896 Mm
EV Charging Scope: External Chargers; Project-selected
Solution Provider: YINTU
Product Description

CONTAINERIZED SOLAR STORAGE & CHARGING SOLUTIONS

375-500 kW / 780-1000 kWh Air-Cooled Hybrid ESS

10-ft containerized LiFePO4 storage with 375-500 kW output and 780-1000 kWh energy. Combines battery, BMS, PCS and EMS for solar-storage charging projects, on/off-grid operation and generator-supported microgrids. EV chargers are project-selected.

Product Overview

A 10-ft platform for commercial properties and industrial sites that need a choice between direct PV input and an external-inverter solar arrangement. The two configurations share the stated enclosure dimensions but use different PV integration paths.

YINTU is an energy storage solution provider. We work with capable manufacturing partners to select equipment, coordinate technical information and develop a configuration around the customer's site requirements. The listed product is a configurable platform; the supply and service boundaries are agreed for each project.

10-ft Air containerized ESS in a conceptual solar-storage charging site
Illustrative application concept, not a completed project photograph. Solar arrays, vehicles and EV chargers are external project equipment.

How Solar, Storage and Charging Work Together

Solar generation can serve site demand while storage shifts selected energy to later periods. The PCS connects the DC battery system with AC loads, and EMS coordination supports the chosen operating schedule and reserve policy. External EV charging equipment can be included in the site solution after its rating, quantity, charging interface and control compatibility are selected.

The 500 kW configuration uses an external PV inverter. Other configurations use integrated MPPT; internal MPPT limits do not apply to the external-inverter version.

The generator port provides an interface for an external diesel generator where required. Grid and generator operation, switchgear and source-transfer logic follow the approved electrical design. AC/DC integration here describes the storage and conversion architecture; the specification does not state built-in EV charging guns or a direct DC EV charging output.

10-ft Air hybrid ESS functional AC DC solar storage charging topology
Functional concept only, not an installation wiring diagram. External equipment and protection are selected for the project.

Key Features

AC and DC equipment integrated around one control platform

LiFePO4 batteries, BMS, PCS and EMS are integrated with a generator port. The battery operates on the DC side and the PCS provides the AC interface. This creates a coordinated equipment platform for solar-storage charging projects while the site distribution, protection and external chargers are designed as part of the complete solution.

PV integration matched to the selected configuration

The 500 kW configuration uses an external PV inverter. Other configurations use integrated MPPT; internal MPPT limits do not apply to the external-inverter version.

On-grid and off-grid operation

The datasheet lists rated power for both modes and a switching time below 10 ms. The project design coordinates the grid connection, generator, essential loads and transfer arrangement. This rating should not be treated as a universal no-interruption guarantee for every load.

Thermal management and protection

The IP54 enclosure combines air conditioning for the battery with intelligent PCS cooling and an integrated fire protection system. The quoted operating temperature is -10 to +55 C, with humidity from 5% to 95% and altitude <2000 m.

Expandable project architecture

The series supports multiple units in parallel; the datasheet does not specify a universal maximum count. Parallel operation requires a coordinated control, communication, cable and protection design.

Applications and Project Value

Commercial solar and EV charging

Combine a solar canopy or rooftop array, this storage container and external EV chargers into a coordinated site solution. Compare direct PV coupling on the 375 kW configuration with external-inverter integration on the 500 kW version before fixing the system architecture.

Factories with existing PV inverters

For the 500 kW version, evaluate the external PV inverter, site AC distribution, protection and control compatibility as one design. This offers a configuration path for projects with separately selected solar conversion equipment, subject to engineering confirmation.

Supermarkets and commercial campuses

Schedule stored energy around trading hours, refrigeration demand and charging activity. Storage can support demand management and solar self-consumption when the dispatch plan reflects the actual tariff, load profile and grid limits.

Weak-grid and generator-supported sites

Use stored energy and the generator connection to support selected loads through supply disruptions. The design establishes reserve levels, transfer logic, generator coordination and the maximum permitted parallel arrangement.

Configuration Comparison

Parameter 375 kW / 780 kWh 500 kW / 1000 kWh
Rated battery energy 780 kWh 1000 kWh
Nominal battery voltage 832 V 832 V
Rated battery capacity 942 Ah 1256 Ah
Maximum PV input 360 kW External PV inverter
Maximum PV voltage 950 V DC Not specified internally
MPPT voltage range 250-850 V DC External inverter selected separately
PV input current (source notation) 200 A x 3 Not specified internally
MPPT channels 3 Not specified internally
Rated AC power: on-grid / off-grid 375 kW 500 kW
Maximum AC current: on-grid / off-grid 560 A 757 A
Approximate system weight 8,700 kg 10,600 kg

The 500 kW configuration uses an external PV inverter. Other configurations use integrated MPPT; internal MPPT limits do not apply to the external-inverter version.

Power and energy are paired configurations, not independent values that can be freely mixed. Battery energy, voltage and ampere-hour values are reproduced as specified; practical usable energy and backup time depend on the final operating limits and site load. PV current notation is preserved as 200 A multiplied by the stated channel count.

System and Installation Parameters

Item Specification
AC voltage / wiring 400 / 230 V AC; L1 / L2 / L3 / N / PE
Frequency 50 / 60 Hz
On/off-grid switching time <10 ms
Parallel operation Multiple units; project-specific quantity
Diesel generator port Yes
Communication RS485 / Wi-Fi
Ingress protection IP54
Fire protection system Yes
Operating temperature -10 to +55 C
Humidity 5-95%
Operating altitude <2000 m
Battery cooling Air conditioning
PCS cooling Intelligent cooling
Dimensions (source order) 2991 x 2438 x 2896 mm

Dimensions retain the order used in the supplied datasheet; axis labels are not inferred. Weights are approximate and vary with configuration. Confirm the final installation drawing, lifting plan, foundation loading, service clearances and cable routing before deployment.

YINTU Project Selection and Supply Scope

Start with the country and site environment, grid voltage, interval load profile, PV array or existing inverter information, generator details and backup priorities. For a charging project, add charger power, vehicle schedule and expected simultaneous demand. YINTU coordinates configuration selection and technical clarification with the manufacturing partner.

The proposal defines the selected storage configuration, controls, switchgear and any project accessories. PV modules, external PV inverters where needed, diesel generators, EV chargers, civil works, transport, installation and commissioning are included only when listed in the agreed scope. Certification documents, warranty, pricing, lead time and payment terms are confirmed for the selected model and destination.

Frequently Asked Questions

Are EV chargers built into the container?

The supplied datasheet describes a PV-storage-diesel microgrid platform and does not specify built-in charging guns or charger ratings. YINTU can coordinate a solar-storage charging solution using separately selected EV chargers and a suitable site distribution and control design.

Can PV strings connect directly?

The 500 kW configuration uses an external PV inverter. Other configurations use integrated MPPT; internal MPPT limits do not apply to the external-inverter version.

Can it operate when the grid is unavailable?

The series includes off-grid ratings and a stated switching time below 10 ms. The final design must establish the supported loads, reserve, source-transfer arrangement and generator coordination where used.

How many units can be connected in parallel?

Multiple units; project-specific quantity. The final quantity and control arrangement must be confirmed for the project.

What determines backup duration?

The selected energy configuration, usable SOC window, reserve policy, conversion and auxiliary losses, temperature and changing site demand all affect runtime. Nominal kWh alone is not a guaranteed AC energy delivery or backup duration.

Plan Your Solar-Storage Charging Project

Send YINTU your load profile, PV plan, charging requirements and backup target. We will coordinate a suitable configuration and a clear equipment proposal with the manufacturing partner.

Technical source: YT-Hybrid ESS-375-500kW-780-1000kWh-Air datasheet, V1.0, October 2026. Final specifications and included equipment follow the approved project configuration.

You May Also Like
Quality Floor Standing Residential Energy Storage Systems 16 KWh Long Lasting Home Energy Solutions factory

Floor Standing Residential Energy Storage Systems 16 KWh Long Lasting Home Energy Solutions

A 16 kWh floor-standing LiFePO4 battery with 51.2 V, 314 Ah and four casters. Standard current: 100 A; maximum continuous current: 200 A. Supports up to 15 parallel units, Bluetooth and BMS communication with a compatible external inverter.
Quality Indoor Floor Standing Residential Energy Storage Systems All In One Solar Storage For Homes factory

Indoor Floor Standing Residential Energy Storage Systems All In One Solar Storage For Homes

Floor-standing home solar storage with an integrated off-grid PV inverter and LiFePO4 battery. Four configurations offer 5.12–14.3 kWh and 5–11 kW, with direct PV input, AC charging and 230 V output. IP20 for indoor use.
Quality 12 KW / 32 KWh Stackable Home Solar Energy Storage Systems All In One ESS IP20 factory

12 KW / 32 KWh Stackable Home Solar Energy Storage Systems All In One ESS IP20

A 32 kWh stackable home ESS using 2 × 16 kWh battery modules and a 12 kW split-phase inverter. The appliance-style design combines solar input and battery storage for compatible 120 / 240 V homes.
Quality 5 KW 10.24 KWh Stackable Residential Battery Storage Systems All In One Solar ESS factory

5 KW 10.24 KWh Stackable Residential Battery Storage Systems All In One Solar ESS

A 10.24 kWh stackable home battery with an integrated 5 kW inverter, 120 V AC output and up to 6 kW PV input. The appliance-style enclosure brings solar charging and battery storage into a tidy indoor system.
Contact Us
You Can Contact Us At Anytime!