375 kW / 780 kWh Air-Cooled Hybrid ESS with Three MPPTs
375 kW air-cooled hybrid ESS
,780 kWh containerized battery storage
,hybrid ESS with three MPPTs
375 kW / 780 kWh Air-Cooled Hybrid ESS with Three MPPTs
Use the 375 kW, 780 kWh air-cooled 10-foot configuration for a site with integrated PV inputs. Check ventilation, ambient conditions and the three-array PV design.
YT-Hybrid ESS-375-500kW-780-1000kWh-Air
Selected configuration
| Selected power / energy | 375 kW / 780 kWh |
|---|---|
| Nominal battery voltage | 832 V |
| PV input | 360 kW max., three MPPT channels |
| PV input voltage | 250–850 V MPPT, 950 V max. |
| AC interface / max. current | 400 / 230 V three phase, 50/60 Hz, 560 A max. |
| Ambient limits | −10 to +55°C, altitude below 2000 m |
| Container / cooling | 10 ft, IP54, battery air conditioning |
| Dimensions / approx. mass | 2991 × 2438 × 2896 mm, approx. 8700 kg |
Choose the integrated-PV variant
The selected 375 kW unit combines 780 kWh of LFP battery capacity with three built-in MPPT channels. The source assigns up to 360 kW of PV input to this version. It lists an external PV inverter arrangement for the 500 kW family configuration. Match the 375 kW option to the site’s three-phase load and its array design. Check each MPPT group and the total PV limit from the final selected model data.
Review the air-cooled placement
Locate the enclosure using the manufacturer’s airflow and service layout. Screen the −10 to +55°C source operating range, humidity and altitude against the planned outdoor location. Review nearby walls, adjacent containers and equipment that exhausts hot air into the same area. Request the verified airflow, required clearances and any output derating for the intended environment before finalising the pad arrangement.
Check the combined solar and load schedule
Use the daylight PV and interval load profile to estimate charge opportunities and available energy for later dispatch. Compare the desired AC power with the 375 kW and 560 A source limits. Define the operating conditions for any generator and isolation scheme. If the system will transition between grid-connected and off-grid modes, specify the project switching and protection sequence and verify it against the actual connected loads.
Confirm the project integration package
YINTU coordinates the integrated battery, PCS, EMS and PV interfaces with the manufacturing partner. Confirm the PV strings, cable protection, auxiliary requirements, switching and connection equipment on the approved one-line diagram. Provide the site ambient data, mechanical layout and target load schedule for a configuration review.
Series illustration. Airflow, clearances and final operating limits follow the confirmed configuration.
Floor Standing Residential Energy Storage Systems 16 KWh Long Lasting Home Energy Solutions
Indoor Floor Standing Residential Energy Storage Systems All In One Solar Storage For Homes
12 KW / 32 KWh Stackable Home Solar Energy Storage Systems All In One ESS IP20